Case study 15LondonFire doors

105 Victoria

Fire doors & fire screens: lift core installation

Client
Skanska
Location
London
Our role
Full supervision and installation
Disciplines
Fire doors, Fire screens
Scope
Fire doors and fire screens to lift core
Extent
15 floors
Supported by
Radii (direct support and training)

The outcome

Fire doors and fire screens to the lift core across 15 floors, installed to a very high standard under considerable programme pressure.

Black-framed glazed fire doors and screens at a lift core lobby, opening onto the office floor at 105 Victoria.
Black-framed glazed fire doors and screens at a lift core lobby, opening onto the office floor at 105 Victoria.

Overview

OMFC delivered full supervision and installation of fire doors and fire screens to the lift core at 105 Victoria, across 15 floors.

The package was installed using materials of the highest quality. Working in close collaboration with Radii, OMFC received direct support throughout the project, including training courses and new technical training. This partnership gave OMFC valuable experience in fire-rated door and screen installation.

The OMFC team worked to a very high standard under considerable programme pressure, and their performance was outstanding.

Scope of works

  1. Installation of fire doors to the lift core, across 15 floors.
  2. Installation of fire screens to the lift core, across 15 floors.
  3. Full supervision of the package by OMFC.
  4. Direct support from Radii throughout, including training courses and new technical training.
Next case study 16 / 17 Citi Bank Project