Case study 04CambridgeCurtain walling

Student residential

Curtain wall glazing

Location
Cambridge
Our role
Specialist installation contractor
Disciplines
Curtain walling, Crane-assisted glazing, Entrance door sets
Package value
c. £200k
Completed
2024

The outcome

Every glazing unit craned in, fixed and sealed at height, exactly to the supplier’s specification.

A glazing unit being lifted into position at the student residential development, using a mobile crane and vacuum lifting equipment.
A glazing unit being lifted into position at the student residential development, using a mobile crane and vacuum lifting equipment.

Overview

This project involved the installation of curtain wall glazing units to a new student residential development in Cambridge. On this project, OMFC International collaborated closely with the appointed supplier, who provided the glazing units and specification, while OMFC International carried out the on-site installation using its own equipment and a qualified, certificated workforce.

OMFC International’s site team handled each glazing unit from ground-level preparation through crane-assisted lifting to its final fixing and sealing at height, working from mobile elevating access platforms across the multi-storey brick facade. The works were carried out safely and precisely, in full accordance with the supplier’s specification.

Scope of works

  1. On-site installation of curtain wall glazing units to the building facade, to the supplier’s specification.
  2. Safe handling and positioning of glazing units at ground level, using vacuum lifting equipment.
  3. Crane-assisted lifting of glazing units into position across the multi-storey facade.
  4. Fixing and sealing of glazing units from mobile elevating work platforms at height.
  5. Installation of glazed entrance door sets.
  6. Collaboration with the appointed supplier throughout, using OMFC International’s own equipment and qualified installation team.
Next case study 05 / 17 100 Fetter Lane