Case study 08LondonRoof glazing

Bishops Square

Roof glazing refurbishment

Client
Permasteelisa Group
Address
10 Bishops Square, London E1
Our role
Specialist installation contractor
Disciplines
Roof glazing, Structural sealant, Glazing replacement
Package value
c. £1.3m
Programme
18 months, day and night shifts
Team
12 OMFC operatives
Completed
2019

The outcome

Eighteen months of day and night shifts on the roof, with the building below kept fully operational throughout.

The glazed office buildings of Bishops Square, framed by mature trees.
The glazed office buildings of Bishops Square, framed by mature trees.

Overview

Over an eighteen-month programme, our team of twelve carried out a full refurbishment of the roof glazing at Bishops Square, working day and night shifts to keep the building below fully operational.

Every sealant joint across the roof was cut out and replaced, and all pressure plates between the glazing units were renewed. Damaged glass panels were removed and replaced as part of the same works, restoring the roof to a fully weathertight condition.

Scope of works

  1. Complete removal and replacement of structural glazing sealant
  2. Replacement of all pressure plates across the roof glazing
  3. Replacement of broken glazing units
  4. Day and night shift working over 18 months
  5. Team of 12 operatives working at height on a live building